• Located at Yalgoo Mineral Field Western Australia

• Previous geology survey reports and mapping of outcrops on site, gold mineralization has been confirmed repeatedly by successive POW’s and recent work by the MGR team

• The Minerichee and 3 – Shaft mine sites at M59/291 have been shown, through studies commissioned by the vendor, t o indicate non – JORC surface probable reserve of approx. 20,000 oz. of recoverable gold

• Pre – strip planning is being completed and processing can commence immediately

Future activities

• Stabilize production and increase to 40 tons per hour

• Expand the drilling program to further define the mineable resource